My Plumbing Inc

Projects

Neighborhood, scope, and the wall we opened.

Flagship work across the Valley. Photography here is representative of the finish and construction language we specify — real job photos replace these as each project is released.

Backyard ADU

North Hills · 2025

Backyard ADU

Permitted ADU, full wet walls, kitchen and bath

Utility tie-in and inspection path locked before finishes. Built to rent, not just to photograph.

Kitchen remodel

Sherman Oaks · 2025

Kitchen remodel

Layout, millwork, island plumbing

Island sink and dishwasher decided before stone. No trap cut after fabrication.

Primary bath

Encino · 2024

Primary bath

Waterproofing, tile, fixtures

Pan, niche, and penetrations treated as structure. Linear drain, limestone, bronze.

Rear addition

Van Nuys · 2024

Rear addition

New wing, matching stucco, new bath

Roof drainage and stack planned with the massing so the joint is not the leak.

Garage studio

Studio City · 2025

Garage studio

Insulated conversion, bath, egress

Legal conversion, not a drywalled stall. Bath drain and insulation decided on day one.

Phased whole-home

Northridge · 2024

Phased whole-home

Kitchen, two baths, laundry, one open-wall sequence

Walls opened once. Plumbing and waterproofing closed before any millwork arrived.

Galley kitchen rebuild

Burbank · 2025

Galley kitchen rebuild

Gas, sink, dishwasher, new layout in a tight footprint

Kept the window. Moved the sink eight inches. That eight inches was the whole bid conversation.

Hall bath

Panorama City · 2024

Hall bath

Pan, tile, fan, fixtures

Slope and pan first. Tile second. The order that keeps a hall bath from becoming a callback.

In-law ADU

Mission Hills · 2025

In-law ADU

Permitted backyard unit, kitchenette, accessible bath

Setbacks and the sewer tap were the real design. The rest was finish.

Wet-wall remodel

Glendale · 2024

Wet-wall remodel

Repipe of opened walls during a kitchen and laundry redo

Copper in the wall, named on the scope. The pretty work started after inspection.

Family-room wing

Encino · 2023

Family-room wing

Foundation, roof tie-in, powder room

Massing matched the existing eave. Drainage designed with the new roof, not after it.

Office conversion

Sherman Oaks · 2023

Office conversion

Garage to office, no bath — insulation and electrical only

We told them not to force a bath. The garage did not drain. They still have a quiet room.

CallBook a visit